A bathroom renovation in Dubai costs about AED 8,000 to 18,000 for a refresh that keeps the tiles, AED 18,000 to 30,000 to fully renovate a small bathroom, and AED 30,000 to 55,000 for a standard ensuite or family bathroom. Premium finishes or moving the toilet and shower push it to AED 55,000 to 80,000 and above. Those are 2026 figures before 5% VAT.
The ranges are wide because a bathroom is really eleven small jobs stacked in a fixed order, and each one has its own cost. This guide takes them one at a time, then prices a real-sized apartment bathroom line by line, so you can see how a quote is built instead of guessing whether a total is fair.
Quick Answer: Bathroom Renovation Prices in Dubai for 2026
In 2026, most full bathroom renovations in Dubai land between AED 18,000 and 55,000 before VAT, depending on size and finish. A refresh without demolition starts around AED 8,000, and premium bathrooms or layout changes start around AED 55,000. The table shows what each tier includes, which matters more than the headline number.
| Scope | Typical 2026 price (before VAT) | What it includes |
|---|---|---|
| Refresh | AED 8,000 - 18,000 | New WC, basin, mixers, vanity and accessories; re-grout and reseal; no demolition or new waterproofing |
| Full renovation, small or guest bathroom | AED 18,000 - 30,000 | Strip to walls and slab, new pipework, waterproofing with flood test, tiles, sanitaryware, glass, lighting |
| Full renovation, standard ensuite or family bathroom | AED 30,000 - 55,000 | As above, in a larger room or with better-grade tiles, fittings and glass |
| Premium or layout change | AED 55,000 - 80,000+ | Large-format or stone tiles, bespoke vanity, freestanding bath, wet room, or moving the WC or shower |
| Tub-to-shower conversion only | AED 12,000 - 25,000 | Remove the bath, rework the drain, waterproof and tile the shower zone, fit glass |
!Before VAT
Renovation work in the UAE carries 5% VAT. A AED 30,000 quote that excludes VAT is AED 31,500 to pay. Always check which way a quote is written, and ask for a tax invoice showing the contractor's TRN.
Why Every Guide Quotes a Different Number
Published Dubai bathroom renovation prices range from about AED 7,000 to over AED 150,000 because each source counts something different. Some quote labour only, some include materials, some add VAT, and "full renovation" can mean anything from new fittings to a stripped-out room. Compare what is inside a number before comparing the number itself.
When you read a price online or in a quote, it is usually one of the five types below. Two contractors can both say "AED 20,000" and be describing very different amounts of work.
| How the price is quoted | What it leaves out | How it compares |
|---|---|---|
| Labour only | Tiles, sanitaryware, vanity, glass: often half the total or more | Looks cheapest; the materials bill arrives separately |
| Labour plus "basic" material allowances | Anything above the allowance, such as better tiles or a concealed cistern | Rises as soon as you choose finishes |
| Supply and install, before VAT | 5% VAT, and sometimes permit fees and building deposits | The most common format |
| Supply and install, including VAT | Usually only authority fees and deposits | The number closest to what you will pay |
| Premium or showroom pricing | Nothing, but the spec is premium throughout | Real, but not a guide to a standard bathroom |
One well-known Dubai guide quotes AED 7,000 to 20,000, and states in the small print that the figure excludes materials. Another quotes AED 15,000 to 150,000+, and its top end is a marble spa bathroom. Neither is wrong. They are answering different questions. The line-item breakdown that follows avoids the problem by pricing each part of the job separately.
Line-Item Costs: What Each Part of a Bathroom Renovation Costs
A full bathroom renovation breaks down into eleven cost lines. The biggest are usually sanitaryware and mixers, shower glass, and plumbing, followed by tiles and tiling labour. Demolition, electrics, screed, waterproofing and finishing items are smaller individually but add up to a quarter or more of the total. The rates below are typical 2026 Dubai ranges.
| Cost line | Typical 2026 range (AED) | What drives it up or down |
|---|---|---|
| Protection, demolition and debris removal | 1,000 - 2,500 | Tile layers to remove, building rules on hours and lift use, debris routes |
| Plumbing rough-in | 2,500 - 5,500 | New supply lines, drain connections, concealed valves; more if fixtures move |
| Electrical works | 1,000 - 3,000 | Number of lighting and socket points, mirror lighting, extract fan |
| Screed and wall preparation | 800 - 2,000 | How far out of level the floor and walls are; screed laid to fall |
| Waterproofing and flood test | 1,000 - 2,500 | Floor area, wall height covered, number of penetrations |
| Tiling labour, adhesive and grout | 60 - 120 per m² | Tile size, pattern, mitred edges, niches, epoxy grout |
| Tiles, supply only | 40 - 150 per m² (natural stone 150 - 300+) | Porcelain vs stone, format, brand |
| Sanitaryware and mixers | 3,000 - 12,000 | Wall-hung WC and concealed cistern vs close-coupled; mixer brand; rain shower |
| Vanity and mirror | 1,500 - 6,000 | Standard sizes vs made to measure; mirror cabinet or LED mirror |
| Shower glass and linear drain | 4,000 - 7,000 | Size, frameless vs framed, fixed panel vs door |
| Accessories, silicone and final clean | 500 - 1,500 | Towel rails, hooks, holders, sanitary silicone |
A few of these deserve a closer look, because they are where quotes differ most.
Plumbing rough-in covers new hot and cold supply lines to each fixture, the connections from each waste to the existing drain, and the concealed valve bodies that sit inside the wall behind the shower and bath controls. In a bathroom that keeps its layout, AED 2,500 to 5,500 is typical. When a quote shows a small plumbing figure, check whether it replaces the supply pipes or only reconnects the old ones. In a building with ageing copper, reconnecting old pipe to new fittings is where the next leak comes from.
Waterproofing looks small on paper, at AED 1,000 to 2,500 for a standard bathroom, but it is the line that protects everything else. It covers the membrane across the floor and up the walls, reinforcing tape at corners, sealing collars around pipes, bonding the drain into the membrane, and the flood test that proves it before tiling. A quote that lists "waterproofing" without saying where the membrane goes and whether a flood test is included is not describing the same work as one that does.
Tiles are priced two ways, and mixing them up is the most common reason tile budgets go wrong. The supply price is the tile itself, per square metre. The tiling price is the labour, adhesive and grout to fix it. A tile that costs AED 60 per m² to buy may cost another AED 60 to 120 per m² to lay, and more if it is large-format, laid in a pattern, or mitred at the corners.
Worked Example: A Standard Apartment Bathroom, Costed
A typical Dubai apartment bathroom of 2.0 by 2.4 metres, tiled floor to ceiling, costs about AED 17,800 to 48,900 to renovate fully before VAT, or roughly AED 18,700 to 51,400 including it. The low figure uses standard porcelain and mid-range fittings. The high figure uses better tiles, a wall-hung WC, a rain shower and a made-to-measure vanity.
Start with the tile area, because almost every other line follows from it. Measure the floor and every wall you will tile, subtract the door, then add a margin for cuts and breakage.
| Measurement | Calculation | Result |
|---|---|---|
| Floor | 2.0 m × 2.4 m | 4.80 m² |
| Walls, floor to ceiling | 2 × (2.0 + 2.4) × 2.4 m | 21.12 m² |
| Less the door opening | 0.8 m × 2.1 m | -1.68 m² |
| Area to tile | 24.24 m² | |
| Tiles to buy, with 10% for cuts and breakage | 24.24 × 1.10 | about 27 m² |
Large-format tiles, diagonal layouts and patterned floors waste more in cuts, so allow 15% rather than 10% for those. Buy all the tiles in one order, from one production batch. A second order months later can differ in shade, which shows as soon as the two sit side by side.
| Cost line | Low (AED) | High (AED) |
|---|---|---|
| Protection, demolition and debris removal | 1,000 | 2,500 |
| Plumbing rough-in | 2,500 | 5,500 |
| Electrical works | 1,000 | 3,000 |
| Screed and wall preparation | 800 | 2,000 |
| Waterproofing and flood test | 1,000 | 2,500 |
| Tiling labour: 24 m² at AED 60 - 120 | 1,440 | 2,880 |
| Tiles: 27 m² at AED 40 - 150 | 1,080 | 4,050 |
| Sanitaryware and mixers | 3,000 | 12,000 |
| Vanity and mirror | 1,500 | 6,000 |
| Shower glass and linear drain | 4,000 | 7,000 |
| Accessories, silicone, final clean | 500 | 1,500 |
| Total before VAT | 17,820 | 48,930 |
| Total including 5% VAT | 18,711 | 51,377 |
Look at where the spread comes from. The civil work (demolition, screed, waterproofing and tiling labour) moves by about AED 5,600 between the low and high columns. Sanitaryware, vanity and glass move by about AED 16,500. In other words, most of the difference between a AED 20,000 bathroom and a AED 45,000 one is the products you choose, not the building work. That is useful, because it means you can control the budget through selections without touching the parts that keep the bathroom dry.
!What this example leaves out
Permit or NOC fees, a building's refundable deposit, and anything found behind the wall during demolition, such as corroded pipes or an old leak. The hidden-costs section below puts numbers on those.
Costs by Bathroom Type
A guest toilet with only a WC and basin costs about AED 12,000 to 22,000 to renovate fully, because it has no shower to waterproof or glaze. A small bathroom with a shower costs AED 18,000 to 30,000, a standard ensuite AED 30,000 to 55,000, and a master bathroom with bath, shower and double vanity AED 45,000 to 80,000 or more.
| Bathroom type | Typical full renovation (before VAT) | Why |
|---|---|---|
| Guest toilet or powder room (WC and basin) | AED 12,000 - 22,000 | Small tile area, no shower glass, simpler waterproofing |
| Small bathroom with shower | AED 18,000 - 30,000 | Full wet-room waterproofing and glass in a small footprint |
| Standard ensuite or family bathroom | AED 30,000 - 55,000 | More tile area, bath or larger shower, fuller specification |
| Master bathroom (bath, shower, double vanity) | AED 45,000 - 80,000+ | Largest tile area, two sets of fittings, often premium finishes |
| Tub-to-shower conversion, rest of bathroom kept | AED 12,000 - 25,000 | Drain rework, waterproofing and tiling in the old bath zone, new glass |
Many people in Dubai call the guest toilet renovation a "toilet renovation" and the rest a "bathroom renovation". The distinction matters for budgeting. Without a shower, there is no shower glass (AED 4,000 to 7,000 in the example) and far less waterproofing, so a guest toilet is not simply a smaller version of the same cost.
The tub-to-shower figure assumes the rest of the bathroom stays. It is priced on the drain first. A bath waste is sized for a slow-emptying tub, and a shower drain has to keep up with a shower running at full flow. If the existing drain can take a linear drain at the right level, the conversion stays near the low end. If the floor has to be built up or the drain moved, it moves toward the high end.
Apartment vs. Villa Costs, and Renovating Several Bathrooms at Once
Apartment bathrooms are usually smaller than villa bathrooms, but not proportionally cheaper, because tower rules on working hours, lift bookings and debris add time to every stage. Villa bathrooms cost more mainly through size and specification, and through work under the slab if ground-floor drains move. Renovating several bathrooms together lowers the cost of each.
In an apartment, the building sets the pace. Demolition may be allowed only during certain hours, materials go up in a booked service lift, and debris has to leave the same day by a set route. None of that changes the materials, but it stretches the labour over more days, which is why two identical bathrooms can cost more in a tower than in a low-rise building. The building may also hold a refundable deposit against damage to common areas, set by its own rules.
In a villa, the extra cost usually comes from what the space invites: bigger showers, freestanding baths, double vanities, more tile. The other villa cost is the floor. Moving a ground-floor WC or shower means breaking and re-casting part of the slab to re-route the drain, and upper-floor changes open the ceiling of the room below, which then needs patching and painting.
Doing two or three bathrooms in one project is cheaper per bathroom than doing them one by one, for four reasons:
- One design process and one set of approvals covers every bathroom.
- One tile order, bought in a single batch, often at a better rate than several small orders.
- One site set-up, one round of protection and one debris route.
- Trades move from room to room without the gaps and call-outs a single bathroom involves.
The trade-off is living without several bathrooms at once. In a villa, most owners phase the work so one bathroom stays usable every night.
Hidden Costs and Variation Orders
The costs most likely to be added after a bathroom renovation starts are corroded pipes found behind the wall, a floor that needs rebuilding to drain properly, permit and NOC fees, and material changes made after ordering. Each is predictable, which means each can be priced or allowed for before work starts instead of arriving as a variation order.
| Hidden cost | Typical range (AED) | How to avoid the surprise |
|---|---|---|
| Corroded or failing concealed supply pipes | 2,500 - 5,500 to replace the bathroom's supply | Ask whether the quote replaces or reuses the supply pipes; pressure-test before demolition |
| Floor screed rebuilt to correct falls | 800 - 2,000 | Check how the existing floor drains before quoting; include screed in the scope |
| Old leak damage found under the tiles | Varies with the damage | Have suspected leaks checked before renovation, not during it |
| Community or authority permit fees | From a few hundred to a few thousand, by community and scope | Ask the contractor which approvals apply, and whether their fees are in the price |
| Building security deposit | Set by the building; refundable | Budget for it in cash flow even though it comes back |
| Ceiling patch in the room below (villas) | A few hundred to about 1,500 | Include it in the scope when upper-floor drains are touched |
| Material changes after ordering | Restocking fees, re-orders and delay | Finalise tiles, mixers and cistern before demolition |
| VAT, if the quote excludes it | 5% of the total | Ask for every quote on the same basis |
Permit and NOC fees vary more than any other line, because they depend on where the property sits and what changes. A like-for-like bathroom in a tower may need only a building NOC. A layout change in a gated villa community can need a developer NOC followed by an authority permit. One Dubai contractor, for example, cites AED 750 to 1,200 for a Dubai Municipality permit and AED 1,500 to 3,500 for a master developer NOC. Treat figures like these as a guide, and ask for the fees for your building and scope in writing.
The pipe line is the one to take most seriously. In an older building, a quote that reconnects new fittings to old copper or galvanised steel saves a few thousand dirhams now and moves the risk behind brand-new tiles. If the pipes are old, replacing them while the wall is open costs far less than a leak repair later. If you already suspect a hidden leak, have it found before the renovation is scoped, so the repair is priced in rather than discovered.
Where to Save on a Bathroom Renovation, and Where Not To
The safest savings are in layout and finishes: keep the WC and shower where they are, choose standard porcelain in a standard size, pick a standard-size vanity, and tile only the walls that get wet. Never save on waterproofing, supply pipes, concealed valves or drain sizing. They cost little, and they are the parts you cannot reach again without breaking tiles.
| Choice | Approximate saving | Why it is safe |
|---|---|---|
| Keep the WC and shower in their current positions | AED 5,000 - 10,000 versus relocating | No drain re-routing, no slab or ceiling work, simpler approvals |
| Standard porcelain instead of large-format or natural stone | AED 2,000 - 6,000 on a 27 m² bathroom | Porcelain performs as well in a bathroom; the saving is appearance only |
| Tile to about 1.2 m outside the shower and use moisture-resistant paint above | About AED 650 - 1,750 in the example bathroom | Walls outside the shower zone don't take direct water |
| A standard-size vanity instead of made to measure | Often a large share of the vanity line | Standard units are built for bathrooms; buy one with a moisture-resistant carcass |
| Refinish a sound bathtub instead of replacing it | Refinishing costs AED 1,200 - 2,500 | The tub stays, the surface is renewed, no demolition around it |
| A fixed glass panel instead of a hinged door | Less glass and hardware | Works well in walk-in showers with enough space |
Now the other side. These lines are a small share of the budget and carry most of the risk:
- Waterproofing and the flood test: AED 1,000 to 2,500 in the example, about 5% of the low total. A failed membrane costs the tiles, and in an apartment the ceiling below as well.
- Supply pipes: replacing them with the walls open costs a fraction of opening the new tiles later.
- Concealed valves: a brand with cartridges sold in the UAE means a future repair is a part, not a wall.
- Drain sizing and falls: a shower drain too small for a rain head floods the floor every day.
- The extract fan: ducted to the outside or the building's exhaust, not into the ceiling void.
A useful test for any saving is to ask whether you would see the result every day or never see it again. Savings you can see, like tile size or a vanity, are a matter of taste. Savings you can't see, like membrane coverage or pipe quality, are a bet against your own ceiling.
How to Read a Bathroom Renovation Quote, and Pay Safely
A good bathroom renovation quote is itemised by cost line, names the brands or allowances for every product, states what is excluded, and ties payments to stages you can see completed. A single lump sum with no breakdown can't be compared, checked or held to later, however attractive the total looks.
Check each quote for these points before comparing totals:
- Itemised lines for demolition, plumbing, electrical, screed, waterproofing, tiling and each product group, not one figure for everything.
- Product brands and models, or clear allowances in AED for each: tiles per m², WC, mixers, vanity and glass.
- Waterproofing described: which areas the membrane covers, how high it goes, and whether a flood test is included.
- Whether supply pipes are replaced or reused.
- Who applies for the NOC and any permit, and whether fees are included.
- VAT stated clearly, with a tax invoice and TRN on payment.
- A written timeline by stage.
- The warranty in writing: what it covers and for how long. Ours is two years on workmanship.
On payment, link each instalment to a stage you can check yourself, rather than to dates. A sensible pattern is an initial payment when materials are ordered, a payment after the waterproofing passes its flood test, another after tiling, and the balance after snagging is complete. The flood test is the one to watch. It is the last moment you can see the waterproofing before it disappears under tiles, so ask to see the test, or a photo of the water level at the start and end.
Any change to the agreed scope, whether you ask for it or the contractor finds something behind the wall, should come as a written variation with a price before the extra work is done. That one habit prevents most renovation disputes.
What to Send for an Accurate Bathroom Renovation Quote
An accurate bathroom renovation quote needs five things from you: photos of every wall and the floor, the room's measurements, the building or community name, what you want to change, and the finish level you have in mind. With those, a contractor can price most lines before visiting, and the site visit confirms them instead of starting from nothing.
- Photos of each wall, the floor, the ceiling and any access panels, plus close-ups of the shower controls, the WC and the area under the basin.
- Measurements: length, width and ceiling height, and the size of the door and any window.
- The building or community, so the approval route and working rules are known before pricing.
- What changes: same layout, a tub-to-shower conversion, or moving the WC, shower or basin.
- The finish level you're aiming for, with a photo or two of bathrooms you like, even from a catalogue.
- Any history of leaks, stains on the ceiling below, or smells, because they change the scope.
Photos under the basin and around the shower controls tell a plumber more than any description. They show the pipe material, the valve type and the condition of the connections, which decide whether the plumbing line in your quote reuses what is there or replaces it.
Bathroom Renovation in Dubai
Our full service: design, permits, materials, plumbing, waterproofing and tiling, with a two-year workmanship warranty.
PPR Pipe Installation
How new bathroom supply pipework is installed and pressure-tested before the walls close.
Repiping & Pipe Replacement
When the old pipes behind a bathroom should be replaced during the renovation.
Residential Leak Detection
Find a suspected hidden leak before the renovation is scoped, not during it.
Frequently Asked Questions
How much does a bathroom renovation cost in Dubai in 2026?
How much does a small bathroom renovation cost in Dubai?
Does a bathroom renovation quote in Dubai include VAT?
How much does it cost to move a toilet in a bathroom renovation?
How much do bathroom tiles cost per square metre in Dubai?
How much does bathroom waterproofing cost?
How much does shower glass cost in Dubai?
Why do bathroom renovation quotes vary so much?
Are permit and NOC fees included in the renovation price?
Is it cheaper to renovate two bathrooms at the same time?